Case 1: Reducing Picking Burden for Frontline Workers

 

DSC09297001

The client is a global machinery manufacturer specializing in high-pressure plunger pumps and hydraulic components, with products sold in over 190 countries and regions. As production capacity increased, there was an urgent need to reduce manual picking workload and improve warehouse turnover efficiency.

Challenges

  • Materials were long stored on the floor, leading to low space utilization and distributed inventory.
  • Over 3,000 SKUs were picked manually across the warehouse by more than 20 operators, with small, batch orders.
  • Production took place on the first floor, while picking occurred on the second, resulting in inefficient outbound operations due to distance.
DSC09302001
DSC09323001

Solution Delivered

  • 4 double-deep pallet stacker cranes
  • Integrated conveyor system
  • Software suite: WMS / WCS / API / ECS
  • Custom racking system for stacker cranes

 

modular-1
Project Results

This project implemented four double-deep pallet stacker cranes along with a conveyor system, enabling the storage of 3,000 different types of components-approximately nine times more than traditional floor stacking. A direct logistics path was established between the first-floor production area and the second-floor picking zone, where DELIECN pallet stacker cranes lift materials directly to the second-floor picking stations, allowing operators to pick items without leaving their workstations. As a result, the number of picking personnel was reduced from 20 to 6, overall operational efficiency increased by 40%, and labor intensity was significantly reduced.

 

 