Heavy-duty warehouse automation is not difficult because the loads are simply heavier.
The real difficulty appears when one material center has to manage standard pallets, 3-ton heavy loads, 6–8 meter pipes, irregular structural parts, hazardous materials, small electrical components, office supplies, and oversized equipment at the same time.
These materials are completely different in size, weight, storage method, and handling frequency. Trying to force all of them into one storage technology would make the warehouse harder to operate rather than easier.
For a large coal-industry group in Shanxi, this became the central planning issue.
The group operates 13 mining and production sites across coal mining, coal preparation, coking, power generation, and fine chemicals. Its material distribution center therefore has to support thousands of different items required by multiple industrial operations.
The project was planned as a fully automated material center, but not as one single AS/RS.
Instead, different automated storage and handling technologies were assigned to different material groups, while WMS, WCS, and 3D visualization bring them back into one management system.
One Warehouse, Different Materials, Different Automation Logic
The first step in the project was not choosing equipment.
It was understanding the materials.
Standard palletized goods can be stored in a high-bay AS/RS. Long pipes cannot. A 3,000 kg load requires a different handling structure from a 50 kg tote. Hazardous materials need a dedicated storage area, while small parts benefit from compact automated storage.
This led to a warehouse divided by material characteristics rather than by one standardized storage method.
The important point is that every zone remains part of the same automated material flow.
Heavy Pallets: Pallet Stacker Cranes Handle the Main Storage Volume
The main material storage area contains standard and near-standard palletized goods.
For 1,300 × 1,300 mm pallets, the design uses six double-mast, double-deep Pallet Stacker Cranes, each with a load capacity of up to 1,500 kg.
This section provides 3,521 pallet locations.
Larger palletized loads are handled separately.
A seventh Pallet Stacker Crane is designed to handle both standard 1,300 × 1,300 mm pallets and large 1,300 × 2,700 mm loads, with a maximum capacity of 3,000 kg per pallet.
Another 224 storage locations are planned for this larger load format.
Conveyors connect the high-bay storage area with the inbound and outbound process.
For the customer, the value is not simply heavy lifting.
The automated system takes over repetitive storage, retrieval, and transfer tasks that previously required repeated forklift handling and manual coordination.
Long Materials Need a Different Storage Structure
Pipes and profiles introduce another challenge.
The material length can reach 6–8 meters, making conventional pallet storage unsuitable.
For this area, the project uses five-level heavy-duty cantilever racking, with a load capacity of 700 kg per arm.
The storage method is selected around the physical form of the material rather than trying to convert long materials into standard pallets.
This is an important principle in heavy-duty automation:
the equipment should adapt to the material, not the material to the equipment.
Irregular and Oversized Loads Require Specialized Handling
Irregular structural parts are stored in a dedicated heavy-duty beam-racking area.
The storage positions are designed around load units of approximately 2,700 × 1,300 × 1,200 mm, with a load capacity of up to 4,000 kg per location.
Oversized materials are handled through a dedicated area using crane-assisted storage and movement.
These materials may be too large or too irregular for conventional automated pallet handling, but they still remain inside the overall digital warehouse process.
That distinction matters.
The automation system does not need every material to use the same machine. It needs every material to remain visible, traceable, and manageable inside the same warehouse logic.
Automated Handling Continues Beyond the Storage Area
The storage system is only one part of the material center.
Heavy materials still need to be received, picked, moved, and issued.
Independent KBK crane systems support loading, unloading, and picking, with lifting capacity up to 1.5 tons.
AGVs connect the picking area with different storage zones, reducing repeated manual transportation between warehouse sections.
Together with Pallet Stacker Cranes, conveyors, lifting equipment, and other specialized devices, the project is designed to achieve approximately 90% automated material handling.
For operators, this reduces repetitive heavy handling and exposure to high-risk manual movement.
WMS and WCS Turn Different Zones into One Warehouse
Physically, the material center contains several very different storage systems.
From a management perspective, however, the customer does not want six separate warehouses.
They need one inventory view.
DELIECN WMS and WCS manage the process from material coding and storage through allocation, picking, and issue.
Inventory alerts, shelf-life monitoring, replenishment, stocktaking, and traceability can be managed digitally, while WCS coordinates the automated equipment carrying out the physical tasks.
This becomes especially important for a group serving 13 mining and production sites.
A material request should not depend on warehouse staff remembering which storage zone contains the item.
The system needs to know:
what material is required,
where it is stored,
which equipment should retrieve it,
and how the inventory should change after the task is completed.

3D Visualization Brings the Whole Material Center into One View
The project also uses DELIECN 3D Visualization Central Control System.
Through digital twin technology, the system recreates the material distribution center and presents the status of multiple storage zones and automated equipment in a single visual environment.
For a warehouse containing Pallet Stacker Cranes, conveyors, AGVs, cantilever storage, hazardous storage areas, vertical carousels, and specialized lifting equipment, this centralized view is particularly valuable.
Managers can understand the overall operating condition of the warehouse instead of checking each subsystem separately.
The physical storage methods remain different.
The management experience becomes unified.
What Heavy-Duty Warehouse Automation Really Requires
This project shows that heavy-duty warehouse automation is not about finding one machine powerful enough to handle everything.
The real engineering challenge is to build a system where very different materials can each use the right storage and handling technology while remaining under one automated management structure.
Standard heavy pallets use Pallet Stacker Cranes.
Large 3-ton loads use reinforced heavy-duty AS/RS equipment.
Long pipes use cantilever storage.
Irregular and oversized goods use specialized heavy-load areas.
Small parts use vertical automated storage.
AGVs, conveyors, KBK systems, and lifting equipment connect the different operating zones.
WMS, WCS, and 3D visualization then bring the whole material center together.
For mining, energy, chemical, and heavy manufacturing companies, this is a more useful way to think about automation.
The question is not:
"Which automated warehouse technology is best?"
It is:
"How can every material type be handled in the right way, while the whole warehouse still operates as one system?"
That is where heavy-duty warehouse automation creates its real value.